Preparation of studies, design and construction supervision of road and infrastructure works of the northern commercial area - Aqaba -

The work includes the following: (Total plot of land of 655 acres.)  Roads networks  Rainwater drainage network  Water Main lines  Water Network - Main feeding Lines with different diameter and lengths - 180 mm and 2 km length to feed water distribution networks - A 300 mm diameter Ductile Iron pipeline with a length of 2.7 km - And 300 diameter - A 200 mm diameter Ductile Iron pipeline with a length of 6.00 km - 150 mm ductile iron pipelines diameter and 3.80 km length - 63 mm polyethylene lines diameter 1.40 km length  Wastewater network as follows: - 600 mm diameter GRP main line with a length of 1 km connects the Project with Aqaba treatment plant. - 500 mm diameter GRP conveyor with a length of 2.6 km. - 400 mm diameter GRP line with a length of 1.6 km. - 315 mm diameter UPVC Sub-lines with a length of 800 m. - 225 mm diameter UPVC Sub-lines with a length of 4.0 km. - 160 mm diameter UPVC service links with a length 1.2 km.  Communication networks

Project country Provided services Name of client Origin of funding Name of partners(if any) Dates(start/end)
Aqaba 250 MM Aqaba Development Corporation Aqaba Development Corporation 2010-2014