Rrehabilitation of public water and sanitation infrastructure in Mafraq, Irbid and Zarqa governorates. The consultant submit detailed design, BOQs (Bills of Quantities) and technical specifications for all components (civil, structural, electrical, and mechanical). Aqeb: Design of new pump room, operator room, Design of new water tank with (150-200 m3) volume, and sewage collection tank. Rehabilitation of chlorine system. Assessment of existing drawdown/capacity/operating history/pump test data of the three bores to establish optimal operating pump rates and confirmation that the distributing pumps and new reservoir are appropriately sized based on bore extraction rates and demand and the proposed new transmission line and distribution network. Sweilmeh: Rehabilitation of the pump room, operator room, and chlorination room. Desktop assessment of drawdown/capacity/operating history/pump test data of the two bore to establish optimal, operating pump rates. Batrawi: Assessment of the capacity of the existing pump station. Maintenance of 2 existing pumps. Design of new pump room Asa’ara: Design of new pump room, Chlorine room, control room, operator room, and sewage collection tank. Rehabilitation and maintenance of 2 existing pumps. Design of new larger water storage reservoir, and maintenance of existing water reservoir (25 m3).
| Project country | Provided services | Name of client | Origin of funding | Name of partners(if any) | Dates(start/end) |
|---|---|---|---|---|---|
| Jordan | Agency for Technical Cooperation and Development (ACTED) | UNICEF | 2014-2015 |