Posted on: Tue, 09/06/2022 - 12:57 By: admin
Zara/Ghor Haditha Highway

32km, 2-lane highway, in an externally rough terrain, designs of reinforced concrete bridges and 94 storm-water drainage structures, retaining walls & extensive protection concrete and gabion protection works.

Services Performed Client Contract No. Cons. Cost Mill. US$ Year
Re-Design & Construction Supervision MPWH 96/86 50 1987-1995