Emergency Rehabilitation Project for village access roads in Nablus district – stage II
The purpose of the project is to study and design the rehabilitation works of about 63 kms covering 20 village access roads in Nablus district. The scope of works includes carrying out and/or the preparation of Topographic & Field Surveys, Pavements Condition surveys, Traffic Surveys & Analysis, Soil Surveys and Geotechnical Investigations, Pavements Analysis & Design Calculations, Detailed Design Drawings Including PlanProfile, Water Ways, Intersections, Culverts, Retaining Walls, Signs, Traffic Paint Lines and Safety Barriers, Tender Documents & Specifications & Cost Estimates.
| Services Performed | Client | Contract No. | Cons. Cost Mill. US$ | Year |
|---|---|---|---|---|
| Study, Design and Preparation of Detailed Engineering Drawings and Tender Documents | Palestinian Economic Council for Development & ReConstruction (PECDAR) | PMO/ERP 2/EW/047 A- WB | 1.5 | 1997 |