Posted on: Tue, 09/06/2022 - 12:40 By: admin
Emergency Rehabilitation Project for village access roads in Ramallah district - stage II

The purpose of the project is to study and design the rehabilitation works of about 82 kms covering 21 village access roads in Ramallah district. The scope of works includes carrying out and/or the preparation of Topographic & Field Surveys, Pavements Condition Surveys, Traffic Surveys & Analysis, Soil Surveys and Geotechnical, Investigations, Pavements Analysis & Design Calculations, Detailed Design Drawings Including PlanProfile, Water Ways, Intersections, Culverts, Retaining Walls, Signs, Traffic Paint Lines and Safety Barriers, Tender Documents & Specifications & Cost Estimates.

Services Performed Client Contract No. Cons. Cost Mill. US$ Year
Study, Design and Preparation of Detailed Engineering Drawings and Tender Documents Palestinian Economic Council for Development & ReConstruction (PECDAR) PMO/ERP 2/EW/048- WB 2 1997