Posted on: Tue, 09/06/2022 - 09:27 By: admin
Al- Mafraq / Irbid Road

Widening & Upgrading of the existing AlMafraq-Irbid road with an approximate length of 18 Km to accommodate 4-lane primary road. Study, also included the design of two new interchanges.

 

 

Aal Al- Bait Interchange

 

A partial cloverleaf interchange located at Zarqa/ Jaber border road near A'al Albait University in Mafraq. The new bridge is a four lane width.

 

Silos Intersection on Amman / Ramtha Road

 

Constructing Bulb Shape U-turns to serve the wheat silos on Amman / Ramtha road. Study has included providing other alternative of separated interchange.

 

 

Cyber City Intersection & petrol Road intersection Roads in Al-Dlail and Al- Khaldeyah Area

 

Widening and upgrading of the 3 existing roads at Al-Dlail and AlKhaldeyah area, with total length of 6 kms.

Services Performed Client Contract No. Cons. Cost Mill. US$ Year
Study, Design & Preparation of Specifications and Contract Documents MPWH 38/2005 25 2005-2006