Sheryani Road-Wadi Mousa

Construction Supervision and establishment of an alternative road in the center of the City with a length of approximately 800 m and includes road works, protections and the drainage of rain water and ferries and the necessary construction works through the construction of a concrete bridge with a length of approximately 300 m, taking into consideration the importance and sensitivity of the archaeological and historical site and environmental aspects and all that is necessary. * Preparing studies, design and tender documents for the arterial road in Wadi Musa with a length of about 400 m with two lanes and including a bridge Concrete (Box Girder) with a length of 280 m.

Project Country Provided services Name of client Origin of funding Date(start/end)
Jordan 2016-ongoing