The design of the infrastructure works and the road leading to the clothing factory (Classic) - Aqaba, which includes work on designing a road with an approximate length of 1350 m, extending from the Aqaba Dead Sea road to the factory area, and a road extending from the middle of the first road to wrap around the factory with an approximate length of 1205 m. The work also includes other works such as Construction of a canal bridge, side trenches, railings, and infrastructure works such as electricity and communication lines, utility pipelines, painting, road planning, reflectors, signals, kerbstones, sidewalks, and other works, as required, according to the plans and documents of the bid.
| Services Performed | Client | Contract No. | Cons. Cost Mill. US$ | Year |
|---|---|---|---|---|
| Preparation of studies, designs and tender documents | ADC | 64000 | 2021 |