The work includes performing a preliminary sensory inspection on the roads specified in the agreement in terms of the condition of the pavement layers for the entire pavement area of the two-lane roads (Single Carriageway) and the entire pavement area for each direction separately on the roads separated by a median island (Dual Carriageway) to determine the parts that need maintenance to be carried out afterwards Carry out a detailed survey and technical and geotechnical study to determine the type of maintenance needed for this procedure, and then determine the priorities and parts for which maintenance bids will be offered (the lengths of the roads covered by this study in the North Region are 152 km).
| Services Performed | Client | Contract No. | Cons. Cost Mill. US$ | Year |
|---|---|---|---|---|
| Preparation of studies, designs and tender documents | MPW&H | 151000 | 2020- ongoing | |