KAFREIN WATER SUPPLY

PROJECT DESCRIPTION:

In association with Camp Dresser & McKee (CDM) – USA. USAID funded project , consultancy services for design , tender documents, construction and supervision. The project includes the following facilities:

- Installation of 3-well pumping equipment

- Approximately 5200mt of DI pipes (DN 150 to 600) with all related valves , washouts, air release valves, control valves, flow meters, … etc.

- Construction of 225m2/hr water treatment plant, consisting of generators, flocculates and clarifier basins filter units, chemical dosing systems , instrumentation control building, site work, grading, fencing and others.

- Construction of 2000m2 reservoir.

- Telemetry system between well pumps, pressure break control tank and treatment water reservoir.

CONSULTANCY SERVICES:

The services included Construction Supervision

Project country Name of client
Ministry of Water & Irrigation – Water Authority / WAJ