Posted on: Mon, 08/29/2022 - 09:06 By: admin
MADABA UM AL BASATEEN

PROJECT DESCRIPTION: Widening & Upgrading the existing 2-lane road, to a 4-lane divided highway, connecting the Naur-Dead Sea Road with the Eastern Madaba Road leading to the Airport Road. 7 km, 4-lane highway, with a total width of 25 m including R.C. Bridge at Trumpet Interchange, Drainage Structures and all Traffic & Safety Devices.

 

CONSULTANCY SERVICES: Study, Design & Preparation of Contract Documents

Project Country Name of client
Madaba Governorate Ministry of Public Works & Housing-Jordan