Posted on: Mon, 09/12/2022 - 16:27 By: admin
Queen Alia International Airport

The project is located on lands owned by JAC on a plot of area of ​​1000 acres, which is located in the southeastern side of the borders of Queen Alia International Airport. The project consists of the following elements: Implementation of roads and parking lots with a total area of ​​(375,000) sq m and concrete piers with a total length of approximately (5600) sq. M. The implementation of the drinking water network of polyethylene pipes of various diameters with a length of approximately (16100) Mt. The implementation of the sewerage network of pipes (UPVC) of different diameters with a length of approximately (16100) Mt. Implementing a rain water drainage network from reinforced concrete pipes of various diameters with a length of approximately (3465) Mt. Implementation of irrigation water network of polyethylene pipes of different diameters with a length of approximately (39000) mt. Executing the electricity network from copper cables of various sizes, with a length of approximately (39000) MT, distribution and lighting panels, in addition to supplying, providing and installing external lighting poles, number (490) column, as well as the implementation of construction works for sub-power stations, number (19) stations. Implementation of communication networks through the establishment of two assembly stations for communication so that each station feeds the surrounding areas through fiber-optic lines or cables (48) length (3600) Mt approximately and capacity (12) length (3000) Mt with necessary connections and manholes.

 

Implementation of a black fire extinguishing network (BLACK STEEL) with different diameters and a length of (15430) meters approximately, including installing fire pumps and all necessary. Carrying out water tank works with a capacity of (900)m3, including all mechanical and electrical works, and the pump control room. Carrying out the conveyor line with a length of (2.5) km and the pump control room.