Emergency Rehabilitation Project for Roads in Hebron & Bethlehem Districts in the West Bank

The purpose of this project is to study and design the rehabilitation works for 15 No. roads in Hebron & Bethlehem Districts consisting of the following categories and components which are detailed as follows:

 

Regional Road:

 

This group consists of (2 roads of total length 19 kms): The works include the rehabilitation and upgrading of existing roads, linking main roads and serving several communities These roads will be designed to be 2-lane (at least 6.0 m wide) asphalt facilities with 2.0m base course shoulder each side.

 

Access Road:

 

This group consists of (5 roads of total Length 24 kms): The works include the rehabilitation and upgrading of existing roads, linking villages to main or regional roads. These roads will be designed to be 2- lane (5.5m wide) asphalt facilities with proper Shoulder. These roads will be designed to be two lane (5.5m wide) asphalt facilities with proper shoulders.

 

Dirt Road:

 

This group consists of (8 roads of total length 29 kms)

Services Performed Client Contract No. Cons. Cost Mill. US$ Year
Design & Preparation of Tender Documents of Emergency Rehabilitation. Palestinian Economic Council for Development & ReConstruction (PECDAR) PMO/MID P/EW088/WB 15 1999