Posted on: Mon, 09/05/2022 - 19:51 By: admin
Preparation of studies and designs for the main corridor (TAXIWAY) for the lands west of the runway of King Hussein International Airport / Aqaba

The work includes preparing studies, designs and tender documents. Preparing studies and designs for the main corridor of TAXIWAY aircraft for the lands west of the runway of King Hussein International Airport - Aqaba

Services Performed Client Contract No. Cons. Cost Mill. US$ Year
Preparation of studies, designs and tender documents ADC 138000