Posted on: Mon, 09/05/2022 - 19:43 By: admin
Design of New Bridge instead of Existing Bridge 9 at Ghor Haditha

The project includes the design of the New Bridge Instead of the existing Bridge No. (9) At Ghor Haditha (design consists of traffic and environment studies).

Services Performed Client Contract No. Cons. Cost Mill. US$ Year
Preparation of studies, designs and tender documents MPW&H 1,267 24000 2021