PROJECT DESCRIPTION:
In association with C amp Dresser & McKee (CDM) – USA. USAID funded project , consultancy services for design , tender documents and construction supervision . The project consists of:
- Construction of new chemical building at Dair Alla Intake pump station to contain:
- Chlorine Dioxide System
-Potassium per manganese feeding system\
- Chlorine scrubber system - Construction of powered activated carbon steel framed building located at ZAI WTP
- Sedimentation basin drainage improvements
- Installation of Air scour system, polymer system
- Modification of Alum / Ferric sulfate feed system - Refurbishment of administration building
- Modification of Mixing Channels
- Installation of Baffle walls in Raw water tanks
CONSULTANCY SERVICES:
The services included design and preparation of Tender and Contract Documents
Project country | Name of client | ||
---|---|---|---|
Jordan | Ministry of Water & Irrigation – Water Authority / WAJ |